Location[1] DescriptionCurrently the Main Block of the school is closed for renovation and restoration. This work will include repairs resulting from earthquake damage and long term wear and tear, and also modernisation of the classrooms and administration spaces. The main foyer will be restored but remain visually unchanged.
To enable the restoration, all our corridor photos have been placed into storage. If you are looking for a particular photo you can check out the reference document which lists all the photos from the corridors. The corridors were photographed by students and the document will show a reference to find the section of the corridor you are looking for.
The renovation is due to be completed in 2023 Further Information
You can also take a ‘virtual’ walk through the main block, click here to go google maps and take a stroll down the corridors.